loader image

Net Metering – Rajasthan

No. RERC/Secy/Reg. – 110 In exercise of powers conferred under Section 181 read with Sections 61, 66 and 86(1) (e) of the Electricity Act, 2003 (Act 36 of 2003) and all other provisions enabling it in this behalf, the Rajasthan Electricity Regulatory Commission hereby makes the following Regulations for Net Metering and grid connectivity of grid connected Rooftop & Small Solar Photovoltaic systems.

Short title, extent and commencement
  • These regulations shall be called the Rajasthan Electricity Regulatory Commission (Connectivity and Net Metering for Rooftop and Small Solar Grid Interactive Systems) Regulations, 2015, in short, RERC Net Metering Regulations, 2015.
  • These Regulations shall come into force from the date of their publication in the Official Gazette.
Definitions and interpretations
  • In these Regulations, unless the context otherwise requires,
    • “Act” means The Electricity Act, 2003 (36 of 2003) and subsequent amendments thereof;
    • “Connection Agreement” means the agreement entered into by the Distribution Licensee and the consumer;
    • “Billing cycle or billing period” means the period for which regular electricity bills as specified by the Commission, are prepared for different categories of consumers by the licensee;
    • “Commission” means Rajasthan Electricity Regulatory Commission constituted under the Act;
  • “Connected load’ shall mean the sum of rated capacities of all the energy consuming devices on the consumer’s premises, which can be operated simultaneously. For the purpose of levy of any charges and for deciding the supply voltage, the connected load shall be determined as per method prescribed in the Rajasthan Electricity Regulatory Commission (Electricity Supply Code and Connected Matters) Regulations, 2004 and subsequent amendments thereto; “Distribution Licensee” or “Licensee” means a person granted a license under Section 14 of the Act or deemed licensee as per Section 14 of the Act authorizing him to operate and maintain a distribution system for supplying electricity to the consumers in his area of supply ;”Electricity Supply Code” means the Electricity Supply Code specified under section 50 of the Act and subsequent amendments thereof; “Eligible Consumer” means a consumer of electricity in the area of supply of the distribution licensee, who uses or proposes to use a rooftop or small solar system installed in the consumer premises, to offset part or all of the consumer’s own electrical requirements, given that such systems can be self-owned or third party owned; “Financial year” or “year” means the period beginning from first day of April in an English calendar year and ending with the thirty first day of March of the next year; “Interconnection point” means the interface of solar power generation facility system with the network of distribution licensee ;“Invoice” means either a periodic bill / supplementary bill or a periodic Invoice/ supplementary invoice raised by the Distribution Licensee; “kVAh” means kilo volt ampere hour ;“kWp” means kilo watt peak; “Net meter” means an appropriate energy meter capable of recording both import & export of electricity or a pair of meters one each for recording the import and export of electricity as the case may be; “Net metering” means methodology under which the electricity generated by the Solar rooftop system owned by the consumer and delivered to the Distribution Licensee may be utilized to offset the electricity supplied by the Distribution Licensee to the consumer during the applicable billing period; “Obligated Entity” means the entity mandated under clause (e) of subsection (1) of section 86 of the Act to fulfill the renewable purchase obligation and identified under RERC (Renewable Energy Certificate and Renewable Purchase Obligation Compliance Framework) Regulations, 2010;“Premises” means rooftops or/and elevated areas on the land, building or infrastructure or part or combination thereof in respect of which a separate meter or metering arrangements have been made by the licensee for supply of electricity; “Rooftop PV Solar Power Plant” means the solar photo voltaic power plant including small solar systems installed on the rooftops/ground mounted or open land of consumer premises that uses sunlight for direct conversion into electricity through photo voltaic technology;
  • “Renewable Energy Certificate (REC)” means the certificate issued in accordance with the Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010 and subsequent amendments thereof;
    • “Renewable energy system” means the system to generate electricity from such source(s) which are recognized as renewable energy source(s) by Ministry of New and Renewable Energy (MNRE) or any other agency as may be notified by Government of India/Commission;
    • “State Agency” means the agency as designated by the Commission under regulation 6 of the RERC (Renewable Energy Certificate and Renewable Purchase Obligation Compliance Framework) Regulations, 2010.
    • “Third party owner” means a developer who is generating solar energy on a rooftop but does not own the roof top, and who also enters into a lease/commercial agreement with the roof top owner.
  • All other words and expressions used in these Regulations although not specifically defined herein above, but defined in the Act, shall have the meaning assigned to them in the Act. The other words and expressions used herein but not specifically defined in these Regulations or in the Act but defined under any law passed by the Parliament applicable to the electricity industry in the State shall have the meaning assigned to them in such law.
  • Words or expressions occurring in these regulations and not defined shall bear the same meaning as in the Act.
  • Abbreviations used in these Regulations shall have the meanings as stated in

Annexure – I.

 Scope and application
  • These Regulations shall apply to the distribution licensee and consumers of the distribution licensee availing supply from it in its area of supply in the State of Rajasthan.
  • The Eligible Consumer may install the rooftop solar system under net metering arrangement which,
  • shall be within the permissible rated capacity as defined under these Regulations.
    • shall be located on the consumer premises.
    • shall interconnect and operate safely in parallel with the distribution licensee network.
  • These Regulations do not preclude the right of State Nodal Agency or Distribution Licensee of the State to undertake Rooftop PV Solar Power Plants of 1 MWp and above capacity through alternative mechanisms.
General Principles

The distribution licensee shall offer the provision of net metering arrangement to the consumer, who intends to install grid connected Rooftop PV Solar Power Plants, in its area of supply on non-discriminatory and first come first serve basis:

Provided further that the Consumer is Eligible to install the grid connected Rooftop PV Solar Power Plants of the rated capacity as specified under these Regulations:

Provided also that the interconnection of such system with the grid is undertaken as specified under these Regulations and in compliance of Central Electricity Authority (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations, 2013.

Connectivity of Roof Top PV Solar Power Plants
  • The cumulative capacity to be allowed at a particular distribution transformer shall not exceed 30% of the capacity of the distribution transformer:
  • The distribution licensee shall update distribution transformer level capacity available for connecting Rooftop PV Solar Power Plants under net metering arrangement on yearly basis and shall provide the information on its website as well as to the Commission.
Eligible Consumer and Individual Project Capacity
  • All Eligible Consumers of electricity in the area of supply of the distribution licensee having or proposing to install a roof top solar energy system may opt for grid connectivity subject to the net metering arrangement pursuant to these Regulations.
  • The maximum Rooftop PV Solar Power Plant capacity to be installed at any Eligible Consumer premises shall not be more than 80% of the sanctioned connected load/contract demand of the consumer;
  • The capacity of Rooftop PV Solar Power Plant to be installed at the Premises of any Eligible Consumer shall be more than one kilo watt peak minimum and shall not be more than one Mega Watt peak (1000 kWp) subject to the condition as specified in sub-regulation (2).

Provided that the capacity of the solar energy system shall be in conformity with the provisions relating to the connected load or contract demand permissible under the Rajasthan Electricity Regulatory Commission (Electricity Supply Code and Connected Matters) Regulations, 2004 and subsequent amendments thereto.

Procedure for application
  • The Eligible Consumer who proposes to install a solar energy system in his premises shall apply in the application form (Annexure – II), which the distribution licensee shall notify on its website as downloadable as well as make available at the relevant sub-divisional office of the distribution licensee along with the application fees as specified in the schedule (Annexure-III) of these Regulations.
  • The licensee shall acknowledge the receipt of the application form and register the application and shall process the application in the order of the receipt.
  • Within ten (10) working days of receipt of the Eligible Consumer’s application, the distribution licensee shall provide written notice that it has received all documents required by the standard interconnection agreement or indicate how the application is deficient.
  • The Distribution Licensee shall assess the feasibility and intimate the Eligible Consumer within fifteen days from the receipt of completed application. The feasibility shall be valid for a period of one month, unless extended by the Distribution Licensee. Provided that if the Distribution Licensee determines that an interconnection study is necessary as per sub regulation (5), the Distribution Licensee shall intimate feasibility or otherwise within sixty (60) days from the receipt of completed application.
  • While intimating the feasibility for the connection of Rooftop PV Solar Power Plant as specified in sub-regulation(4), the Distribution Licensee shall also intimate the Eligible Consumer:
  • The details of documents Eligible Consumer to be submitted by the Particulars of any deficiencies, if noticed, along with instructions to remove such defects.
    • Details of any interconnection study required.
    • The amount of security deposit for the installation of the Rooftop PV Solar Power Plant as specified in the schedule at Annexure-III.
  • The Distribution Licensee shall, on receipt of the security deposit and on removing defects, if any and the documents submitted under sub regulation(5), inform the approval within ten(10) working days from the date of receipt.

Provided that if the deficiency as per sub regulation (5) is not removed by the Eligible Consumer within thirty(30) days from the date of receipt of such intimation to the Eligible Consumer, the application shall stand cancelled and the application fee shall be forfeited.

  • The interconnection agreement (Annexure – IV) shall be executed by the distribution licensee within thirty (30) days of receipt of a completed application. If the distribution licensee determines that an interconnection study is necessary, the distribution licensee shall carry out such interconnection study within sixty

(60) days so as to enable it to execute the standard interconnection agreement within ninety (90) days of a completed application.

  • The Eligible Consumer must execute the standard interconnection agreement and return it to the distribution licensee within thirty (30) days from the date of receipt.
Standards, Operation and Maintenance of Solar Power Generators (SPGs)

The Solar Power Generator (SPG) and equipments will conform to the standards and requirements specified in these Regulations and in the following Regulations and codes as amended from time to time: Central Electricity Authority (Technical Standards for

connectivity of the Distributed Generating Resources) Regulations, 2013.

  • Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006.
    • RERC (Electricity Supply Code and Connected Matters) Regulations, 2004.

The equipments of Solar PV Roof top shall be pre tested by the supplier and a test certificate for the concerned equipment shall be provided to the consumer. The consumer shall get the equipment installed at his/her premises by the representative of the supplier to confirm satisfactory working.

Interconnection with the Grid: Standards and Safety
  • The interconnection of the Rooftop PV Solar Power Plant with the network of the distribution licensee shall be made as per the technical specifications and standards for connectivity provided in the Central Electricity Authority (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations, 2013, as amended from time to time.
  • The connectivity levels at which the Rooftop PV Solar Power Plants shall be connected with the grid are as specified below:
S. No.Connected load of Eligible ConsumerConnectivity level
1.Upto 5 kW240 V- single phase
2.Above 5 kW and upto 18.65 kW415 V-Three phase
3.Above 18.65 kW and upto50 kW/kVA415 V-Three phase
4.Above 50 kW/kVAHT/EHT level
  • The above connectivity norms are applicable to all the solar power generators who seek connectivity with network of the distribution licensees. EHT/HT consumers may install solar power generators at LT/HT voltage and connect them to their LT/HT system.
  • In the interconnection of roof top PV solar energy generator with the local distribution licensee’s grid, the relevant provisions of the Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2010 as amended from time to time shall apply.
  • The solar energy generator shall be responsible for safe operation, maintenance and rectification of defect of its system up to the interconnection point beyond which the responsibility of safe operation, maintenance and rectification of any defect in the system including the net meter shall rest with the distribution licensee.
  • The consumer shall be solely responsible for any accident to human being/ animals whatsoever (fatal/non-fatal/departmental/non-departmental) that may occur due to back feeding from the SPG plant when the grid supply is off. The distribution licensee reserves the right to disconnect the consumer’s installation at any time in the event of such exigencies to prevent accident or damage to man and material.
  • The tests as per EN 50160 and as per distribution licensee’s standards shall be done to ensure the quality of power generated from the Solar PV systems.
  • Any alternate source of supply shall be restricted to the consumer’s network and the consumer shall be responsible to take adequate safety measures to prevent battery power/diesel generator power/ backup power extending to distribution licensee’s LT grid on failure of distribution licensee’s grid supply.
  • The distribution licensee shall have the right to disconnect the roof top PV solar energy generator from its system at any time in the following conditions:
  1. Emergencies or maintenance requirement on the distribution licensee’s electric system;
  2. Hazardous condition existing on the distribution licensee’s system due to operation of solar energy generator or protective equipment as determined by the Distribution Licensee/Transmission Licensee/SLDC.
  3. Adverse electrical effects, such as power quality problems, on the electrical equipment of the other consumers of the distribution licensee caused by the solar energy generation as determined by the distribution licensee. Subject to sub regulation 8(5) above, the distribution licensee may call upon the roof top PV solar energy generator to rectify the defect within a reasonable time.
  • The Rooftop PV Solar Power Plant should be capable of detecting an unintended islanding condition. These systems must have anti-islanding protection to prevent any unfavorable conditions including failure of supply. IEC-62116 shall be followed to test islanding prevention measure for grid connected photovoltaic inverters.
  • Every Rooftop PV Solar Power Plant shall be equipped with automatic synchronization device:

Provided that Rooftop PV Solar Power Plant using inverter shall not be required to have separate synchronizing device, if the same is inherently built into the inverter.

  • The Rooftop PV Solar Power Plant operating in parallel with electricity system shall be equipped with the following protective functions to sense abnormal conditions on electricity system and cause the Rooftop PV Solar Power Plant to be automatically disconnected from the electricity system or to prevent the Rooftop PV Solar Power Plant from being connected to electricity system inappropriately:
  1. Over and under voltage trip functions if voltage reaches above 110% or below 80% respectively with a clearing time upto two seconds; however, appropriate licensee may prescribe a narrower range of voltage for the purpose.
  1. Over and under frequency trip functions, if frequency reaches 50.5 Hz or below 47.5 Hz with a clearing time upto 0.2 seconds; however, appropriate licensee may prescribe a narrower range of frequency for the purpose.
  2. The Rooftop PV Solar Power Plant shall cease to energize the circuit to which it is connected in case of any fault in this circuit.
  3. A voltage and frequency sensing and time delay function to prevent the Rooftop PV Solar Power Plant from energizing a de-energized circuit and to prevent the Rooftop PV Solar Power Plant from reconnecting with electricity system unless voltage and frequency is within the prescribed limits and are stable for at least sixty seconds; and
  4. A function to prevent the Rooftop PV Solar Power Plant from contributing to the formation of an unintended island, and cease to energize the electricity system within two seconds of the formation of an unintended island.
  • The equipment of the Rooftop PV Solar Power Plant shall meet following requirements, namely:
  1. Circuit Breakers or other interrupting equipment shall be suitable for their intended application with the capability of interrupting the maximum available fault current expected at their location.
    1. The Rooftop PV Solar Power Plant and associated equipment shall be designed so that the failure of any single device or component shall not potentially compromise the safety and reliability of the electricity system.
    1. Paralleling device of the Rooftop PV Solar Power Plant shall be capable of withstanding 220% of the nominal voltage at the interconnection point.
  • Every time the Rooftop PV Solar Power Plant of the Eligible Consumer is synchronized to the electricity system, it shall not cause voltage fluctuation greater than ±5% at the point of inter connection.
  • After considering the maintenance and safety procedures, the distribution licensee may require a Rooftop PV Solar Power Plant to provide a manually operated isolating switch between the Rooftop PV Solar Power Plant and the electricity system, which shall meet following requirements:
  1. Allow visible verification that separation has been accomplished;
    1. Include indications to clearly show open and closed positions;
    1. Be capable of being reached quickly and conveniently twenty four hours a day by licensee’s personnel without requiring clearance from the applicant;
    1. Be capable of being locked in the open position;
    1. May not be rated for load break nor may have feature of over-current protection; and
    1. Be located at a height of at least 2.44 m above the ground level.
  • Prior to synchronization of the Rooftop PV Solar Power Plant for the first time with electricity system, the applicant and the appropriate licensee shall agree on the protection features and control diagrams.
  • The power conditioning unit shall have the features of filtering out harmonics and other distortions before injecting the energy into the system of the distribution utility. The technical standards, power quality standards and inverter standards shall be as per Annexure – V of these Regulations or any other standards as may be specified by CEA from time to time.
Energy Accounting and Settlement
  • Distribution licensee shall install metering equipment at the point of interconnection which shall be capable of measuring the difference between the electricity supplied to the Eligible Consumer from the distribution licensee and the electricity delivered by solar system to the distribution licensee’s electric grid. Separate meter shall be provided for measuring quantum of Solar energy generated by the Eligible Consumer.
  • Meter readings shall be taken monthly or as per the billing cycle specified under the applicable Electricity Supply Code and Connected Matters Regulations.
  • For each billing period, the licensee shall show separately the quantum of electricity injected by Eligible Consumer during the billing period, electricity supplied by distribution licensee during the billing period, net electricity billed for payment by the consumer for that billing period and the solar energy generated by the Eligible Consumer:
  • Provided that in the event the electricity injected by a domestic category consumer exceeds the electricity consumed during the billing period, such excess injected electricity above 100 units shall be paid by the Distribution Licensee at Rs 3.14/unit where a capping of average generation of 4.8 units per kW of the approved installed capacity per day of the rooftop solar PV system shall be applicable:

Provided further that for domestic category, the net energy credits less than 100 units under Net Metering achieved in the particular billing period shall be adjusted in the next billing period till credit of 100 units is achieved:

Provided also that in case of consumers, other than domestic category, the capping of 4.8 units per kW of the approved installed capacity per day shall also be applicable and the net surplus electricity remaining available at the end of the billing period of the respective category shall lapse and no payment shall be made for the same.]A

1 Omitted and inserted First proviso of sub-Regulation (3) of Regulation 10, vide First amendment (A), 2019

Provided further that in the event the electricity supplied by the distribution licensee during any billing period exceeds the electricity generated by the Eligible Consumer’s Rooftop PV Solar Power Plant, the distribution licensee shall raise bill for the net electricity consumption at the tariff applicable after taking into account any electricity credit balance remaining from previous billing period:

Provided also in case the Eligible Consumer is under the ambit of time of day tariff, as determined by the Commission from time to time, the electricity consumption in any time block (e.g., peak hours, off-peak hours, etc.) shall be first compensated with the electricity generation in the same time block. Any accumulated excess generation over consumption in any other time block in a billing cycle shall be accounted as if the excess generation occurred during the off-peak time block:

Provided also that the excess electricity measured in kilo-watt hour may only be utilized to offset the consumption measured in kilo-watt hour and may not be utilized to compensate any other fee and charges imposed by the distribution licensee as per the orders of the Commission:

Provided also that the levy and duties imposed by the State Government shall be recoverable.

When an Eligible Consumers leaves the system, that consumer’s unused credits for excess energy generated shall lapse and no payments shall be made.]A

  • Regardless of whether excess energy is delivered to the distribution licensee electric grid, the consumer shall continue to pay applicable charges such as fixed/demand charges, Government levy, etc. The distribution licensee shall charge for electricity used by the consumer in excess of the generation supplied at the distribution licensee’s otherwise applicable rate schedule.
  • The licensee shall give a statement of accounts of electricity showing the following particulars, along with the electricity bill relating to each billing period:
  • Quantum of solar energy generated by the Eligible Consumer;
    • Quantum of electricity injected into the distribution system by the Eligible Consumer;
    • Quantum of electricity supplied by the distribution licensee to the Eligible Consumer;
    • Quantum of net electricity which has been billed for payment by the Eligible Consumer; and
    • Quantum of electricity injected into the distribution system in excess of the drawal by the Eligible Consumer which is carried over to the next billing period.

2 Omitted and inserted sub-Regulation (4) of Regulation 10, vide First Amendment (A), 2019.

  • In case of any dispute in billing it would be settled by the Consumer Grievance Redressal Forum and if issue still remains unresolved shall be settled by the Ombudsman.
Reporting requirements

Distribution licensee shall report the following, by June 1 of each year and shall also be placed on its web site:

  • Total number of Eligible Consumers interconnections at the end of the previous financial year;
  • Total kW capacity of the Eligible Consumers interconnected at the end of previous financial year;
  • Total kWh received by the Eligible Consumer from the distribution licensee by month and by year for the previous financial year;
  • Total kWh of solar energy generated by the Eligible Consumer by month and by year for the previous financial year;
  • Total kWh delivered by the Eligible Consumer to the distribution licensee as per billing cycle and by year for the previous financial year;
    • For each Eligible Consumer interconnection:
  • Solar technology utilized
    • Gross power rating;
    • Geographic location; and
    • Date interconnected.
Solar Renewable Purchase Obligation

The quantum of electricity generated from the Rooftop PV Solar Power Plant under net metering arrangement by an Eligible Consumer, who is not defined as obligated entity, shall qualify towards compliance of Renewable Purchase Obligation (RPO) for the distribution licensee in whose area of the supply the Eligible Consumer is located.

Applicability of other charges

The Rooftop PV Solar Power Plant under net metering arrangement, whether self-owned or third party owned installed on Eligible Consumer premises, shall be exempted from banking and wheeling charges and cross subsidy surcharge.

Metering arrangement
  • The metering system shall be as per the Regulations for installation & operation of meters for rooftop solar systems under net-metering arrangement specified in these regulations.
  • The schematic arrangement for interconnection of Rooftop & Small PV Solar Power Plant with the Distribution Licensee’s grid is shown at Annexure – VI. There shall be two meters. The metering arrangement shall be as per Annexure–VII.
  • The bi-directional (net meter) shall be installed at the interconnection point of the Eligible Consumer with the network of the distribution licensee:

Provided that for the existing consumers, the consumer meter shall be replaced with the bi-directional/ net meter:

Provided further that consumers having ABT compliant meters shall not be required to install additional net meter.

  • Solar meter shall be installed at the solar facility after the inverter to measure the solar generation.
  • These meters shall have the facility for downloading meter readings using Meter Reading Instrument (MRI). Check meters shall be mandatory for rooftop solar systems having capacity more than 250 kW. For installations size of less than and equal to 250 kW, the solar check meters would be optional:

Provided that the cost of new/additional meter (s) shall be borne by the Eligible Consumer and installed & owned by the distribution licensee:

Provided, if bills are prepared on the basis of MRI downloads or if meter reading is taken on the basis of remote meter-reading and the consumer wishes to have a record of the reading taken, he shall be allowed so by the licensee.

  • The meters installed shall be jointly inspected and sealed on behalf of both the parties and shall be interfered/tested or checked only in the presence of the representatives of the consumer and distribution licensee or as per the supply code specified by the Commission:

Provided that the Eligible Consumer shall follow the metering specifications and provisions for placement of meter as developed by the distribution licensee from time to time and as per the supply code:

Provided further that in case the Eligible Consumer is under the ambit of time of day (TOD) tariff, meters compliant of recording time of day consumption/generation shall be employed.

  • The meter readings taken by the distribution licensee shall form the basis of commercial settlement.
  • The technical standards for meters shall be as per Annexure– VIII and shall comply with the standards specified by CEA from time to time.
Communication Facilities

The meters installed for Rooftop PV Solar Power Plants with capacity above 250 kWp shall have the communication port for exchanging real time information with Distribution Licensee.

Sharing of CDM Benefits

The CDM benefits arising from solar energy generation from the roof top PV facility shall be retained by Distribution Licensee:

Provided that the entire CDM benefits obtained by the Distribution Licensee shall be fully passed on to the consumers through ARR.

Penalty

In case of failure to meet the requirements under these regulations for net metering, the solar power generator shall be liable to pay penalty as decided by the Commission from time to time.

Power to give directions

The Commission may from time to time issue such directions and orders as are considered appropriate for the due implementation of these Regulations.

Power to relax

The Commission may by general or special order, for reasons to be recorded in writing, and after giving an opportunity of hearing to the parties likely to be affected may relax any of the provisions of these Regulations on its own motion or on an application made before it by an interested person.

Power to amend

The Commission may from time to time add, vary, alter, suspend, modify, amend or repeal any provisions of these Regulations.

Share:

Facebook
Twitter
Pinterest
LinkedIn

Leave a Comment

Your email address will not be published. Required fields are marked *

On Key

Related Posts

×