loader image

Solar Panel Installation Checklist

As the awareness around climate change, global warming, and environmental degradation grows, solar power systems have become quite popular. Although the shift to solar energy mainly started with commercial solar installations – of late, there has been a considerable increase in solar system installation across residential areas.

A solar power system comprises photovoltaic (PV) modules, an inverter, solar charge controller, solar mounting structure, cables, safety devices, and solar panel connectors. The power generation process starts as the solar panels absorb sunlight, producing Direct Current (DC). Next, the inverter converts the Direct Current (DC) into Alternating Current (AC), which is used to power household appliances. Although these are the main components, an off-grid solar system also comes with a battery for power backup.

Now that we know how solar power systems work, it is essential to understand the basics of solar plant installation.

So, let’s look at the solar panel installation checklist that every prospective buyer should follow:

  • A Well-Built Solar Mounting Structure

Material and workmanship play a vital role in rooftop solar system installations, making the solar mounting structure a critical component of a rooftop solar solution. The layout of the PV system and the solar panel mounting structure need to be designed taking into account the wind loads at the location, according to the wind-speed zone. Therefore, the solar mounting system should ideally be developed or approved by a structural engineer before proceeding with the solar panel installation.

However, there are several types of pre-designed and modular solar structures readily available in the market. These mounting systems are pre-certified for certain wind speeds and can be easily incorporated into the existing solar mounting structure design. Additionally, Galvanized Iron (GI) or aluminum are the most common materials for mounting PV panels. But in the case of GI structure for solar panels, the quality of galvanization is crucial for ensuring a rust-free life.

  • Direction Is Key in Solar Panel Installation

When it comes to solar panel installation, the panels’ direction is of utmost importance, and solar panels need to face true south for maximum power generation. The reason behind it is that when the sun moves from the east to the west, the PV panels get maximum exposure when facing southwards. Moreover, irrespective of which time of the year it is, the inclination will always be towards the south in the northern hemisphere. Hence, for the optimum harnessing of sunlight, the solar PV panels should ideally face south.

  • The Lesser the Shadow, the More the Energy

The performance of solar PV panels is affected by the shading effect of surrounding trees, buildings, passing clouds, and anything else that casts a shadow onto the panels. So, the sunlight converted into solar energy by the PV panels will largely depend on the amount and duration of the shadow falling on it. Therefore, it is crucial to ensure minimal shadowing when going for a solar plant installation, as the lesser the shadow, the more the energy!

  • Get the Tilt Angle Right during Solar Panel Installation

The tilt angle is the angle at which the solar panels are fixed, depending on your location’s latitude. In general, the tilt angle will lie between 9 to 12 degrees in the southern part of India and 25 to 30 degrees in the northern part of the country. The angle decreases as the altitude of installation increases to nullify the impact of high-speed winds on the solar panel installation.

  • Solar Connectors & Solar Cables for Solar Panel Installation

Electrical wiring is an integral part of the solar panel installation checklist. So, after fixing the rooftop mounting structure and assembling the solar panels, the next step is to set up the solar panel connectors and cables. The best way to do this is by using universal MC4 solar connectors, as they can be used with all types of PV panels and make the solar panel installation process much easier and faster.

While some solar PV modules come with wire leads for MC4 solar panel connectors, others come with a built-in junction box. First, you will have to connect the negative solar wire of one PV module to the positive solar wire of another PV panel, making a series connection. Next, you join the positive & positive leads and the negative & negative leads to create a parallel connection. The series connection is essential to increase the voltage levels, whereas the parallel connection is necessary to maintain these voltage levels.

  • Connecting the Solar System with the Solar Inverter

Once you have the solar connectors and solar cables in place, the next step of the solar panel installation is connecting the PV panels with the solar inverter. The positive wire from the solar module should be connected to the positive terminal of the solar inverter. Similarly, you must connect the solar module’s negative wire with the negative terminal of the solar inverter.

  • Connecting the Solar Inverter with the Solar Battery

If you’re going for an off-grid solar power plant installation, you will need a solar battery and then connect it to the solar inverter. The negative terminal of the solar battery is connected to the solar inverter’s negative terminal and vice versa, enabling battery storage and backup. However, you don’t require a solar battery for on-grid solar plant installation.

  • Connecting the Solar Inverter to the Grid

The next step of the solar panel installation is connecting the solar inverter to the grid. To make this connection, all you need to do is plug in the solar inverter to the main power switchboard. Plus, you also need to connect an output wire to the same switchboard that supplies power to your home.

  • Switch On the Solar Inverter

After all the connections are in place, the last step of the solar panel installation is to switch on the solar inverter. Since most solar inverters come with a digital display, it will show the total generation and usage of the solar unit.

What Else Should You Keep in Mind in Solar Panel Installation?

  • Regular Cleaning of Solar Panels

India is a country where dust accumulates very quickly on the panels, hampering optimum power generation. Therefore, solar panels have to be cleaned thoroughly at least once every week, but it would be even better if you could manage to do it daily. However, it is best to use a soft cloth or sponge with mild soaps as harsh detergents and scrubbing can damage the PV panels’ surface. Similarly, you can even use a hose or water pipe to wash off the dust but ensure the water pressure is always low.

  • Proper Maintenance of Solar panels Is Essential

A solar rooftop power system will only deliver the full return on investment if it runs as smoothly as possible. This means that a periodic inspection of the individual components of the solar power system is essential. Moreover, timely intervention can prevent the threat of diminished output, downtime, or a safety hazard. Therefore, always opt for regular maintenance checks and plant health check-ups from trusted solar installation companies.

  • Performance Warranty of Solar Panels

A solar power generation system is believed to have a lifetime of approximately 25 years. Additionally, the solar panels typically have a performance warranty of 25 years, even though other components of the solar power generation system may have different/lesser performance warranties. Therefore, it is essential to check the performance warranties of all the components prior to the solar plant installation.

  • Permits, Approvals, and Subsidies for solar panel Installation

In the case of rooftop grid-tie solar panel installation, the owner must complete all the necessary requirements for getting the net-meter installed, in order to export additional power to the grid and increase the savings. While this may require additional time and fees depending on the local electricity utility, there are no permits needed for battery-based systems. However, if the local government offers subsidy schemes, additional documentation may be required for the subsidy.

The Ministry of New and Renewable Energy (MNRE) announces subsidy and its disbursement procedure. Please refer to the MNRE website for the latest updates and information related to it. Greenon products are designed as per IEC standards and are eligible for subsidy schemes. Our team can assist you in the documentation for the same.

So, what are you waiting for? Switch to solar and book a free solar consultation now 

Share:

Facebook
Twitter
Pinterest
LinkedIn

Leave a Comment

Your email address will not be published. Required fields are marked *

On Key

Related Posts

×